Fabric Cost Calculator

Comprehensive textile cost estimation including fabric, thread, and processing.

Machine Factors: Lockstitch (1.0x thread), Overlock (1.8x thread, +3% waste), Coverstitch (2.2x thread, +1.5% waste). Labor calculated at $0.15/unit.

Fabric Cost Calculator

Estimate total garment production cost. Includes fabric, thread, labor, dyeing, and overheads.

Cost Components

Precise costing is essential for profitability in the apparel industry.

Key Factors

  • Fabric Cost: Consumption × Rate (per kg/m)
  • Thread Cost: Seam Length × Stitch Factor × Rate
  • Labor & Overhead: Cutting, Sewing, Finishing
  • Wastage: Typically 3-10% depending on machinery

Frequently Asked Questions